Tools / Order-by Date
When Do I Have to Order?
Tell us when the windows have to be in the wall and we count back to the day your deposit has to clear, even if that day has passed. On a replacement there is no framing date, and the page says so instead of asking for one.
ZIP is optional. Add it and the emailed copy carries the code numbers for your climate zone.
You get the result, not a newsletter. If it points at work worth doing, someone from our team will reach out to help.
This page counts days, not sizes. It assumes your selections are settled and says nothing about whether your openings can be made. An opening past a published maximum changes the schedule before it changes the price. This page's lead time is production and freight from a cleared deposit; your quotation measures the same range from production release. Installation is booked separately against your wall date, and permit or inspection timing sits outside our schedule entirely.
Talk to us about your dateRather Have Someone Look?
Send a photo of the opening or the whole window schedule, and a person will tell you what fits.